Excess stone removed from boat park
More than 550 tonnes of gravel have been scooped out of the river at Laxey boat park, in a major dredging exercise by the infrastructure department.
The gravel is removed from the inner harbour every two years, to prevent damage to the walls and wier.
A large pile of the dredged gravel has been deposited on Laxey beach through a hatch on the pier. But the DoI says it will soon mingle with the beach stone, when it is washed across the bay by the tides.
Government engaging with UK over international ferry levy plans
Bottleneck car park shut over safety concerns
Dementia demand assessment underway as Public Health forecasting future need