It's after oversized vehicle pulled down part of the line
It could cost up to £5,000 to fix downed tram lines between Onchan and Baldrine.
Extensive damage was caused on Wednesday when an oversized vehicle attempted to drive under the wires.
On top of that, 200m of the copper wiring needed to repair the damage was stolen.
It's understood there have been multiple arrests in connection with the incident.
Andy Cowie is the chief engineer at the Transport Services:
Sidecar competitor confident the class will return to the TT in 2027
Ramsey Swing Bridge 'a key line' for businesses
Protecting farmers from impact of climate change 'a no brainer'
Dogs to be allowed on Douglas Beach year-round as part of council trial