It's after oversized vehicle pulled down part of the line
It could cost up to £5,000 to fix downed tram lines between Onchan and Baldrine.
Extensive damage was caused on Wednesday when an oversized vehicle attempted to drive under the wires.
On top of that, 200m of the copper wiring needed to repair the damage was stolen.
It's understood there have been multiple arrests in connection with the incident.
Andy Cowie is the chief engineer at the Transport Services:
'Possibly the most prolific drug dealer the island has seen' sentenced
Analysis: Could the next Budget leave you with more take-home pay?
Jail for mother who violently shook her infant son