1869 bridge to be replaced
The Glen Helen stretch of the road which runs from Ballig Bridge to Kirk Michael will be shut for a few hours today (Monday) and on Thursday.
It’s so a Girdwood Bridge, on the St John’s side of Glen Helen, can be replaced.
It was originally built in 1869 to form access to a slate quarry.
Infrastructure chiefs say it will be closed between 10am and 4pm on both days.
The route will be open as normal tomorrow and on Wednesday.
Manx Wildlife Trust: Offshore windfarm ecological assessments 'inadequate'
"There is a seat for everyone on the Ben-my-Chree"
Diagnosis changed Onchan resident's life 'overnight'
Village is getting its pub back